Industrial Coatings & Anti-Corrosion Systems | Product Catalog – HUILI
Chlorinated rubber red iron oxide anti-rust coating for steel structure protection.
For steel structures anti-rust and anti-corrosion.
Single-pack; min recoat 12 h at 25°C.
Compatible with chlorinated rubber and acrylic topcoats.
Chlorosulfonated polyethylene anti-rust coating for metal structures and concrete anti-corrosion.
For metal structures, equipment, concrete surfaces.
Single-pack; min recoat 10 h at 25°C.
Topcoat compatible with CSPE and H-CPE systems.
Chlorinated rubber acrylic anti-corrosion topcoat for equipment and industrial building surfaces.
For harsh-environment surface protection and finishing.
Single-pack; min recoat 12 h at 25°C.
Compatible over epoxy and chlorinated rubber primers.
Chlorinated rubber acrylic anti-rust primer for steel in high-corrosion service.
For underwater works, pipelines, gas holders, plant equipment.
Single-pack; dedicated thinner at 3–7%.
Compatible with chlorinated rubber acrylic topcoat.
Chlorinated rubber acrylic marking coating for chimneys and steel tower marking.
For power plant concrete chimneys and steel towers.
Single-component; min recoat 12 h at 25°C.
Gloss ≥70; 25°C surface dry 1 h.
Polyurethane enamel (2K) for steel or concrete protection in corrosive environments.
For metallurgy, power, petrochemical, bridges, ports, terminals.
Mixing ratio 18:3; surface dry 1 h at 25°C.
Compatible over polyurethane or epoxy intermediate coatings.
Aliphatic polyurethane premium topcoat (2K) for durable finishing with weathering resistance.
For bridges, towers, vehicles, marine and port facilities.
Recoat interval: min 12 h, max 7 d.
Compatible over polyurethane or epoxy intermediate coatings.
High-solids polyurethane anti-corrosion topcoat (2K) for high-build steel structure protection.
For petrochemical, power, bridges, port facilities.
Mixing ratio 7:1; pot life 3 h.
Low VOC 305 g/L; artificial weathering 1500 h.
Polyurethane red iron oxide anti-rust primer (2K) for steel structures and long-term anti-corrosion.
For steel structures anti-rust priming.
Mixing ratio 4:1; pot life 3 h.
Compatible with polyurethane and acrylic polyurethane topcoats.
Polyurethane MIO intermediate coating (2K) for sealing and reinforcement in PU systems.
Intermediate layer for polyurethane coating systems.
Mixing ratio 9:1; thinner X-10 at 3–7%.
Compatible with polyurethane and acrylic polyurethane topcoats.
Premium polyurethane marking coating (2K) for steel structures and concrete chimneys.
For chimney marking and protection.
Mixing ratio 18:3; pot life 4 h.
High gloss; fully hardened 7 d at 25°C.
High-chlorinated polyethylene enamel for chemical-industry steel and concrete finishing.
For chemical, petroleum, metallurgy, power industries.
Silver white: split-pack; mixing ratio 6:1.
Thinner X-16; dilution 3–7%.
Vinyl Phosphating Primer (2K) – Two-component phosphating primer for galvanized steel, aluminum, and other light metals.
Forms chemical adhesion to improve intercoat adhesion of subsequent coatings.
Low film thickness system: 15–25 µm DFT per coat; theoretical consumption 0.06 kg/m² at 20 µm DFT.
Min. recoat 2 h (25°C); dedicated PLX06 thinner (10–20%).
High-chlorinated polyethylene topcoat for steel and concrete anti-corrosion finishing.
For steel structures and concrete surfaces.
Single-pack; recoat 24 h to 7 d at 25°C.
Thinner X-16; dilution 3–7%.
High-chlorinated polyethylene anti-rust coating for steel and concrete in corrosive atmospheres.
For chemical-atmosphere and industrial-atmosphere corrosion.
Single-pack; thinner X-16 at 3–7%.
Compatible with high-chlorinated polyethylene topcoats.
High-chlorinated polyethylene intermediate coating for corrosion resistance and “three-proof” service.
Intermediate layer; can be used as first coat.
Single-pack; min recoat 12 h at 25°C.
Compatible with acrylic and chlorinated ether topcoats.