Premium polyurethane marking coating (2K) for steel structures and concrete chimneys.
For chimney marking and protection.
Mixing ratio 18:3; pot life 4 h.
High gloss; fully hardened 7 d at 25°C.
Overview
Two-component premium polyurethane marking coating for marking and protection on steel structures and concrete chimneys.
High-gloss film with good resistance to water, weathering, freeze-thaw, heat, and low temperature.
Composition
Formulated with modified polyurethane resin, premium weather-resistant pigments, additives, and solvents.
Cured with trimer hardener; supplied in Part A & Part B packs.
Typical uses
Marking and protection for steel structures and concrete chimneys.
Technical data (typical)
Appearance: White; bright red.
Theoretical consumption: 0.16 kg/m² at 50 μm DFT (excluding loss).
Density: 1.2 kg/L.
Drying time (25°C): Surface dry 1 h; hard dry 24 h; fully hardened 7 d.
Gloss: High gloss.
Application data (25°C)
Mixing ratio (Part A:Part B): 18:3.
Induction time: 5 min.
Pot life: 4 h.
Application methods: Airless spray, brush, roller.
Thinner: X-10 polyurethane thinner; dilution 3–7%.
Recoat interval (25°C): Min 12 h; max 7 d.
Recommended coats / DFT: 1 coat 30–50 μm; brush/roller 1 coat 30–40 μm.
Surface preparation
Steel: blast/shot blast to Sa 2.5 or power-tool cleaning to St 3; surface profile 30–75 μm.
Concrete: must be dry (moisture content ≤6%) and clean; apply after a sealing primer; for old coatings, roughen and remove chalked/loose parts.
System compatibility / packing / storage
Compatibility: Previous coat—epoxy primer; epoxy intermediate coating; polyurethane primer.
Packing: Part A 18 kg; Part B 3 kg.
Storage: Shelf life 12 months; store dry/cool/ventilated, away from fire and direct sunlight; no outdoor stacking.
We would love to speak with you.
Feel free to reach out using the below details.
Outdoor Non-Intumescent Fireproof Coating for Steel Structure – Outdoor non-intumescent fireproof coating for steel structures.
3 h rating: ≥33 mm; 20–22 kg/m²; 5–6 coats.
Bond strength test result: 0.11 MPa.
Fire test: 33 mm thickness; 5400 mm span; 3.00 h.
Vinyl Phosphating Primer (2K) – Two-component phosphating primer for galvanized steel, aluminum, and other light metals.
Forms chemical adhesion to improve intercoat adhesion of subsequent coatings.
Low film thickness system: 15–25 µm DFT per coat; theoretical consumption 0.06 kg/m² at 20 µm DFT.
Min. recoat 2 h (25°C); dedicated PLX06 thinner (10–20%).
Epoxy MIO intermediate coating (2K) for barrier protection in cathodic-protection coating systems.
Used with PLH53-35 epoxy zinc primer as a supporting intermediate coat.
Salt water resistance: 20 days (as stated).
Mixing ratio 8:1 (by weight); recommended DFT 60–90 µm per coat.
Epoxy Red Lead Anti-Rust Primer (2K) – Two-component epoxy anti-rust primer for steel corrosion protection.
Protect. Perform. Endure. – Advanced Coatings for Industrial Excellence.
© 2025 All Rights reserved Anhui HUILI Coating Technology Co., Ltd. | Privacy Policy