Industrial Coatings & Anti-Corrosion Systems | Product Catalog – HUILI
Polystyrene anti-corrosion coating for steel structures and buried pipelines.
Industrial facilities, steelwork, buried pipelines.
Single-component; pot life unlimited.
Hard film; mildew and water resistance.
Cold galvanizing zinc-rich coating for steel primering without thermal spray zinc.
Steel structures; use when spray zinc is difficult.
Surface dry 10 min; hard dry 12 h.
Cathodic protection; weld and cut compatible.
APP polypropylene pipeline anti-corrosion coating for buried pipelines and tanks.
Buried oil/gas/water pipelines; district heating ≤150°C.
Single-pack; recoat from 6 h.
Applies at -10°C; strong adhesion.
Anti-corrosion coating for steel and concrete in industrial plants.
Petrochemical, metallurgy, power, light industry sites.
Single-pack; pot life unlimited.
Low-temperature application; fast drying.
Fluorinated PVC anti-corrosion coating for chemical gases and dry/wet cycling exposure.
Steel/concrete buildings and chemical equipment.
Single-component; recoat interval 12 h.
10% HCl / 5% H2SO4 resistance 72 h.
New polymer anti-corrosion coating (2K) for water, oil, and sewage pipelines.
Municipal water, circulating water, sewage, oil pipelines.
Recoat 12 h–7 d; pot life 4 h.
Resists acids/alkalis/salts; seawater resistance.
Acid-resistant coating (2K) for harsh chemical plants and pickling lines.
Pickling, galvanizing, electroplating, petrochemical sites.
Mix ratio 21:7; pot life 4 h.
Resists acids, alkalis, salts, chemical atmospheres.
Polymer interpenetrating network coating (2K) for long-term anti-corrosion on steel/concrete.
Pipelines, tanks, gas holders, cooling towers.
Mix ratio 4:1; pot life 4 h.
Service temperature range: -20 to 120°C.
Wet gas holder dedicated anti-corrosion coating (2K) for wet-type gas holder protection.
Dedicated for wet gas holders.
Pot life 3 h; recoat 24 h–7 d.
Primer/intermediate/topcoat system; H2S resistance.
Road marking coating for high-visibility lines on roads and parking areas.
Highways, city roads, parking lots, factory roads.
No-track time ≤20 min; recoat from 6 h.
Single-component; airless spray or roller.
Heat-reflective thermal insulation coating (2K) for cooling and corrosion protection of exteriors.
Metal tanks, LPG tanks, tank trucks, buildings.
Pot life 3 h; recoat 24 h–7 d.
Primer/intermediate/topcoat system; white/light topcoat.
Super weather-resistant fluorocarbon coating (2K) for durable exterior protection of steelwork.
Bridges, gates, towers, chemical equipment.
Mix ratio 8:1; pot life 4 h.
Weathering and color retention: 20+ years.
Anti-mildew coating for interior workshop walls in food and beverage plants.
Beer, dairy, beverage, bakery, pharmaceutical workshops.
2–4 coats; recoat interval 4–6 h.
10% NaOH 240 h; 5% H2SO4 72 h.
Thick-film abrasion-resistant flooring coating (2K) for seamless industrial epoxy floors.
Workshops, warehouses, micro-control rooms and clean areas.
System: sealing primer, primer, mid-coat, topcoat.
Recommended total thickness 1.0–3.0 mm.
Non-toxic epoxy coating (2K) for water-contact linings and sanitary storage spaces.
Tap-water pipelines, water tanks, grain silos.
Pot life 4 h; thinner 3–8%.
Non-benzene solvent; low odor during application.
Epoxy phenolic coating (2K) for tanks and steel in chemical service.
Chemical media tanks and equipment.
Mix ratio 24:3; pot life 3 h.
Resists acids/alkalis/salts; seawater resistance.
Protect. Perform. Endure. – Advanced Coatings for Industrial Excellence.
© 2025 Anhui HUILI Coating Technology Co., Ltd. | Privacy Policy