2-component vinyl ester glass flake lining with outstanding chemical barrier and abrasion resistance for FGD systems, chemical plants and marine splash zones. Wet service rated to 140°C. 2mm+ DFT with low shrinkage cure.
Overview
Two-component vinyl ester glass flake mastic for lining service in severe corrosion environments and thermal cycling.
Composition
Vinyl ester resin (high corrosion resistance, high temperature resistance, high toughness) with specially surface-treated flake materials, additives, and corrosion-resistant pigments/fillers; paste-like material.
Typical uses
Linings for steel structures and concrete buildings in harsh flue gas environments (power plants, smelters, fertilizer plants).
Protection of internal/external surfaces of equipment, pipelines, and tanks for liquid media up to medium corrosion severity.
Composite use with FRP (e.g., high-speed metal impellers).
Acid-making and desulfurization environments and equipment; marine splash zone and harsh three-phase alternating corrosion environments.
Technical data (typical)
Appearance: various colors, paste.
Density: 1.4–1.8.
Tack-free time: 45 ± 15 min.
Recoat interval: 24–48 h.
Tensile strength: ≥25 MPa.
Flexural strength: ≥26 MPa.
Compressive strength: ≥69 MPa.
Impact strength: ≥0.41 J/cm².
Recommended service temperature: PLY-1 wet 120°C, dry 160°C; PLY-2 wet 140°C, dry 170–190°C.
Theoretical consumption: approx. 3–4 kg/m² at 2 mm thickness.
Application data (25°C)
Mixing ratio (A:B): mastic 100 parts; curing agent 1–3 parts.
Surface preparation
System compatibility / packing / storage
Packing: pre-accelerated, two-component; Part A 25 kg, Part B 1 kg.
Storage: store cool and ventilated, below 20°C.
Shelf life: below 20°C, not more than 3 months.
We would love to speak with you.
Feel free to reach out using the below details.
2K epoxy sealer primer engineered for deep penetration and encapsulation of concrete and cement substrates. Seals and stabilizes surfaces to optimize adhesion for subsequent coating systems. Surface dry in 1 hour, full cure in 7 days.
2K epoxy zinc phosphate primer with outstanding saltwater resistance and adhesion for heavy industrial applications. Engineered for port facilities, mining equipment & hydraulic steel in aggressive environments. Sa2.5 prep required, iron red or gray finish.
2K epoxy iron oxide primer with impact-resistant film and strong adhesion on steel and concrete. Compatible with polyurethane, alkyd & chlorinated rubber topcoat systems. Ambient cure at 25°C, 35–40µm DFT.