2K acid-resistant epoxy three-coat system with outstanding resistance to acid, alkali, salt and chemical atmospheres for pickling plants and electroplating facilities. Low-temperature cure, high-build film. Sa2.5 prep, 180µm total DFT system.
Overview
Two-component acid-resistant coating system supplied as primer, intermediate coating, and topcoat for severe corrosive environments.
Composition
Epoxy-containing hydroxyl resin, corrosion-resistant pigments and fillers, solvent, additives; polyisocyanate adduct as curing agent; supplied as two components for primer/intermediate/topcoat.
Typical uses
Protective and decorative coating for equipment and facilities in harsh corrosive conditions, including pickling plants, hot-dip galvanizing, electroplating plants, and petrochemical enterprises.
Technical data (typical)
Appearance: primer iron red; intermediate iron brown; topcoat various colors.
Theoretical consumption: primer 0.11 kg/m² (loss not included).
Theoretical consumption: intermediate 0.13 kg/m² (loss not included).
Theoretical consumption: topcoat 0.11 kg/m² (loss not included).
DFT: primer 40 µm; intermediate 45 µm; topcoat 40 µm.
Density: primer 1.40 kg/L; intermediate approx. 1.45 kg/L; topcoat 1.35 kg/L.
Drying time (25°C): surface dry 2 h; hard dry 24 h; full cure 7 d.
Application data (25°C)
Mixing ratio (A:B): 21:7.
Induction time: 5 min.
Pot life: 4 h.
Application methods: airless spray, brush, roller.
Thinner: HS dedicated acid-resistant thinner, 3–8%.
Recoat interval: min 24 h; max 7 d.
Recommended DFT per coat: 60–80 µm (brush/roller 30–40 µm).
System: HS50 primer + intermediate + topcoat.
Surface preparation
Steel: blast to Sa 2.5 or power-tool clean to St 3; surface profile 30–75 µm.
System compatibility / packing / storage
System compatibility: HS50 acid-resistant primer + intermediate + topcoat.
Packing: Part A 21 kg; Part B 7 kg.
Storage: dry, cool, ventilated; away from fire; avoid strong sunlight; no outdoor storage.
Shelf life: 12 months.
We would love to speak with you.
Feel free to reach out using the below details.
2K high-build epoxy topcoat with high-solids formulation for heavy-duty corrosion protection on steel and concrete. Outstanding chemical, solvent and water resistance. 60µm DFT per coat, 2-coat system to 120µm.
Cementitious non-intumescent fire-resistant coating with 3-hour fire rating for indoor steel structures including stations, warehouses and stadiums. Non-corrosive to steel, smoke-free and non-toxic. Sa2.5 prep, 16–32mm total application thickness.
2K ethyl silicate inorganic zinc-rich primer with high zinc content for maximum cathodic protection on industrial steel. Engineered for bridges, transmission towers & oil pipelines. Weld and cut tolerant, Sa2.5 prep, 40–80µm DFT.