ISO 9001:2015 Certified

PLHS-2 Epoxy Waterline Coating

2K epoxy polyamide waterline coating with outstanding wet-dry cycling resistance, abrasion resistance and water and heat resistance for ship hull waterline protection. High-build film formation. 80–100µm total DFT per 2-coat system.

Facebook
Twitter
LinkedIn

PLHS-2 Epoxy Waterline Coating Description

Overview
Two-component epoxy waterline coating for steel hull areas requiring thick-film build and wet/dry cycling resistance.
Performance focus: water resistance, damp-heat corrosion resistance, hardness, abrasion resistance, and wave impact resistance.

Composition
Modified epoxy resin with premium pigments, solvent, additives, and polyamide adduct curing agent; Part A & Part B.

Typical uses
Protection and decoration for waterline area substrates.

Technical data (typical)

  • Appearance: iron red, purple red.

  • Theoretical consumption: 0.16 kg/m² at 50 µm DFT (loss not included).

  • Density: 1.4 kg/L.

  • Drying time (25℃): surface dry 1 h; hard dry 24 h; full cure 7 d.

Application data (25°C)

  • Mixing ratio (Part A:Part B): 24:3.

  • Induction time: 5 min at 25℃.

  • Pot life: 4 h at 25℃.

  • Application methods: airless spray, brush, roller.

  • Thinner: X-7 epoxy thinner, 2–8% (higher for air spray/roller).

  • Recoat interval: min 24 h; max 7 d.

  • Recommended coats/DFT: 1 coat 40–80 µm; brush/roller 1 coat 30–40 µm.

  • Recommended system: epoxy primer + epoxy intermediate coating.

Surface preparation
Over primer: surfaces must be clean, dry, and free of contamination; roughen if maximum recoat interval exceeded.
As first primer: blast-clean steel to Sa 2.5 or power-tool clean to St 3; surface profile 30–75 µm.

System compatibility / packing / storage

  • Compatibility: used with epoxy primer and epoxy intermediate coating; apply at 5–35℃ and RH ≤85%, avoid rain/snow/strong wind (>6.7 m/s)/heavy fog/intense sunlight.

  • Packing: Part A 24 kg; Part B 3 kg.

  • Storage: store in a dry, cool, ventilated warehouse; keep away from fire sources; avoid strong sunlight; no outdoor stacking; shelf life 12 months.

Contact Us

We would love to speak with you.
Feel free to reach out using the below details.

HUILI fireproof coatings metal paint pail

GT-WSF-Ft Special Outdoor Non-Intumescent Fireproof Coating for Steel Structure

Cementitious hydrocarbon fire-resistant coating engineered for petrochemical and oil refining facilities exposed to hydrocarbon flame. Impact-resistant and crack-resistant with outstanding weathering performance. Sa2.5 prep, 24–33mm total application thickness.

HUILI fireproof coatings metal paint pail

GT-NSP-Fp2.00 Indoor Intumescent Fireproof Coating for Steel Structure

Single-component water-based intumescent coating delivering a 2-hour fire rating for indoor steel structures and building frames. Non-toxic, low-VOC formulation with strong adhesion. Sa2.5 prep required, 1.7–3.3mm application thickness.

HUILI anti-corrosion coatings metal paint pail

PLH53-6 Epoxy Zinc Phosphate Anti-Rust Primer

2K epoxy zinc phosphate primer with outstanding saltwater resistance and adhesion for heavy industrial applications. Engineered for port facilities, mining equipment & hydraulic steel in aggressive environments. Sa2.5 prep required, iron red or gray finish.

INQUIRY NOW

Contact Information