ISO 9001:2015 Certified

PLJ52-4 Chlorosulfonated polyethylene gas holder dedicated coating (primer/intermediate/topcoat)

Single-component chlorosulfonated polyethylene coating system covering primer, midcoat and finish for gas holder exterior protection. Resistant to hydrogen sulfide, chemical gas corrosion and wet-dry cycling. Sa2.5 prep, 150µm+ total DFT.

Facebook
Twitter
LinkedIn

PLJ52-4 Chlorosulfonated polyethylene gas holder dedicated coating (primer/intermediate/topcoat) Description

Overview
Single-component chlorosulfonated polyethylene gas holder dedicated coating for external wall protection.​
Provides resistance to water, hydrogen sulfide, and chemical gas corrosion; fast drying and suitable for low-temperature application.​

Composition
Formulated with chlorosulfonated polyethylene resin, modified resin, quality pigments, mixed solvents, and multiple additives.​

Typical uses
Protection of gas holder outer walls; also suitable for anti-corrosion of other steel structures.​

Technical data (typical)

  • Appearance: Primer—red iron oxide, grey; intermediate—red-brown; topcoat—various colors.​

  • Theoretical consumption: Primer 0.17 kg/m² at 60 μm DFT; intermediate 0.17 kg/m² at 40 μm DFT; topcoat 0.2 kg/m² at 50 μm DFT (excluding loss).​

  • Density: Primer 1.37 kg/L; intermediate 1.4 kg/L; topcoat 1.2 kg/L.​

  • Drying time (25°C): Surface dry 1 h; hard dry 24 h.​

Application data (25°C)

  • Mixing: Single-component.​

  • Induction time: None.​

  • Pot life: Unlimited.​

  • Application methods: Airless spray, brush, roller.​

  • Thinner: X-1 chlorosulfonated polyethylene thinner; dilution 3–7%.​

  • Recoat interval (25°C): Min 24 h; max unlimited.​

  • Recommended coats / DFT: 1 coat 40–60 μm; brush/roller 1 coat 30–40 μm.​

Surface preparation
Steel: blast/shot blast to Sa 2.5, or power-tool cleaning to St 3.​
Surface profile: 30–75 μm.​

System compatibility / packing / storage

  • Compatibility: PLJ52-4 dedicated system—primer + intermediate + topcoat.​

  • Packing: Primer and intermediate 25 kg; topcoat 22 kg.​

  • Storage: Shelf life 12 months; store dry/cool/ventilated, away from fire and direct sunlight; no outdoor stacking.

Contact Us

We would love to speak with you.
Feel free to reach out using the below details.

HUILI anti-corrosion coatings metal paint pail

PLX06 Vinyl Phosphating Primer

2K vinyl wash primer that forms a phosphate conversion layer on ferrous and non-ferrous metal substrates. Engineered for steel, aluminum & galvanized surfaces requiring enhanced adhesion. Surface dry in 15 minutes, compatible with all anti-corrosive topcoats.
HUILI anti-corrosion coatings metal paint pail

PLH53-9 Epoxy Sealer Primer

2K epoxy sealer primer engineered for deep penetration and encapsulation of concrete and cement substrates. Seals and stabilizes surfaces to optimize adhesion for subsequent coating systems. Surface dry in 1 hour, full cure in 7 days.

HUILI anti-corrosion coatings metal paint pail

PLH53-5 Epoxy Rust-Tolerant Anti-Rust Primer

2K epoxy anti-corrosive primer that chemically reacts with surface corrosion to form a stable protective complex. Applies directly to corroded steel up to 60µm, minimizing surface preparation. Minimum 40µm DFT, universal topcoat compatibility.

INQUIRY NOW

Contact Information