2K epoxy polyamide waterline coating with outstanding wet-dry cycling resistance, abrasion resistance and water and heat resistance for ship hull waterline protection. High-build film formation. 80–100µm total DFT per 2-coat system.
Overview
Two-component epoxy waterline coating for steel hull areas requiring thick-film build and wet/dry cycling resistance.
Performance focus: water resistance, damp-heat corrosion resistance, hardness, abrasion resistance, and wave impact resistance.
Composition
Modified epoxy resin with premium pigments, solvent, additives, and polyamide adduct curing agent; Part A & Part B.
Typical uses
Protection and decoration for waterline area substrates.
Technical data (typical)
Appearance: iron red, purple red.
Theoretical consumption: 0.16 kg/m² at 50 µm DFT (loss not included).
Density: 1.4 kg/L.
Drying time (25℃): surface dry 1 h; hard dry 24 h; full cure 7 d.
Application data (25°C)
Mixing ratio (Part A:Part B): 24:3.
Induction time: 5 min at 25℃.
Pot life: 4 h at 25℃.
Application methods: airless spray, brush, roller.
Thinner: X-7 epoxy thinner, 2–8% (higher for air spray/roller).
Recoat interval: min 24 h; max 7 d.
Recommended coats/DFT: 1 coat 40–80 µm; brush/roller 1 coat 30–40 µm.
Recommended system: epoxy primer + epoxy intermediate coating.
Surface preparation
Over primer: surfaces must be clean, dry, and free of contamination; roughen if maximum recoat interval exceeded.
As first primer: blast-clean steel to Sa 2.5 or power-tool clean to St 3; surface profile 30–75 µm.
System compatibility / packing / storage
Compatibility: used with epoxy primer and epoxy intermediate coating; apply at 5–35℃ and RH ≤85%, avoid rain/snow/strong wind (>6.7 m/s)/heavy fog/intense sunlight.
Packing: Part A 24 kg; Part B 3 kg.
Storage: store in a dry, cool, ventilated warehouse; keep away from fire sources; avoid strong sunlight; no outdoor stacking; shelf life 12 months.
We would love to speak with you.
Feel free to reach out using the below details.
2K alkyl silicate inorganic zinc primer delivering cathodic protection with weld and cut tolerance on structural steel. Suited for low-temperature application with universal topcoat compatibility. Sa2.5 prep required, 30µm DFT.
2K epoxy sealer primer engineered for deep penetration and encapsulation of concrete and cement substrates. Seals and stabilizes surfaces to optimize adhesion for subsequent coating systems. Surface dry in 1 hour, full cure in 7 days.
2K C6-modified epoxy MIO intermediate coat engineered to extend coating service life on marine and offshore structures. Pairs with epoxy zinc primer for layered cathodic and barrier protection. 50µm DFT, Sa2.5 prep.
Protect. Perform. Endure. – Advanced Coatings for Industrial Excellence.
© 2025 All Rights reserved Anhui HUILI Coating Technology Co., Ltd. | Privacy Policy