2K epoxy coal tar coating with abrasion-resistant film, outstanding water resistance and anti-mold performance for cooling tower interiors and wastewater pools. High-solids formulation with low application cost. 60µm DFT, 150µm+ total system.
Overview
Two-component epoxy bitumen damp-proof coating system for cooling tower inner walls.
Provides impermeability, waterproofing, mildew resistance, corrosion resistance, and heat resistance.
Composition
Formulated with epoxy resin, bitumen, lamellar fillers, solvents, and additives.
Cured with modified amine; supplied in Part A & Part B packs.
Typical uses
Protection of cooling tower inner walls, and waterproof/anti-corrosion for sewage tanks and underground mines.
Technical data (typical)
Appearance: Primer—red-brown; topcoat—black.
Theoretical consumption: 0.17 kg/m² at 60 μm DFT (excluding loss).
Density: 1.3 kg/L.
Drying time (25°C): Surface dry 1 h; hard dry 24 h; fully cured 7 d.
Application data (25°C)
Mixing ratio (Part A:Part B): 25:2.5.
Induction time: 5 min.
Pot life: 4 h.
Application methods: Airless spray, brush, roller.
Thinner: X-7 epoxy thinner; dilution 3–7%.
Recoat interval (25°C): Min 12 h; max unlimited.
Recommended coats / DFT: 1 coat 40–60 μm; brush/roller 1 coat 30–40 μm.
Surface preparation
Steel: blast/shot blast to Sa 2.5 or power-tool cleaning to St 3; surface profile 30–75 μm.
Concrete: must be sound and dry (moisture content ≤6%), free of contamination; repair defects and wash/de-alkalize, dry, then apply after a sealing primer.
System compatibility / packing / storage
Packing: Part A 25 kg; Part B 2.5 kg.
Storage: Shelf life 12 months; store dry/cool/ventilated, away from fire and direct sunlight; no outdoor stacking.
We would love to speak with you.
Feel free to reach out using the below details.
2K special epoxy primer with outstanding adhesion and impact resistance for demanding industrial applications. Engineered for power plants, bridges & petrochemical facilities. Compatible with all topcoat systems, 60µm DFT per coat.
2K epoxy zinc phosphate primer with outstanding saltwater resistance and adhesion for heavy industrial applications. Engineered for port facilities, mining equipment & hydraulic steel in aggressive environments. Sa2.5 prep required, iron red or gray finish.