Single-component water-based inorganic zinc-rich primer with cathodic protection, self-repairing capability and 400°C heat resistance for oil tanks, bridges and transmission towers. Low-VOC, non-flammable. Sa2.5 prep, 50µm DFT per coat.
Overview
Two-component waterborne inorganic zinc-rich anti-corrosion primer for large steel structures requiring cathodic protection and high-temperature resistance.
Film emphasizes cathodic protection, hardness, and abrasion resistance on steel structures such as tanks, bridges, and towers.
Composition
Waterborne curing resin as binder combined with high-quality zinc powder; two-component waterborne coating using water as thinner.
Typical uses
Anti-rust and anti-corrosion protection for indoor and outdoor large steel components such as oil tanks, steel structures, transmission towers, bridges, ships, TV towers, and similar facilities.
Technical data (typical)
Appearance: grey.
Density: 2.2–2.8 kg/L.
Theoretical consumption: 0.27 kg/m² at 50 µm DFT (loss not included).
Drying time (25℃): surface dry 0.5 h; hard dry 3 h; full cure 48 h.
Heat resistance: up to 400℃ without affecting welding and cutting.
Application data (25°C)
Application methods: spray, brush.
Pot life: 5 h at 25℃.
Thinner: clean water, ≤5%.
Recoat interval: min 24 h.
Surface preparation
Steel: blast or power-tool clean to Sa 2.5 or St 3 with surface profile 30–75 µm before application.
System compatibility / packing / storage
System compatibility: zinc-rich primer for multi-coat systems on large steel structures; subsequent coats should be applied as a fine mist first to avoid bubbling.
Construction conditions: ambient 5–35℃ and at least 3℃ above dew point; not suitable in rain, fog, snow, or when RH >85%.
Storage: dry, cool, ventilated warehouse; 5–35℃; avoid strong sunlight; no outdoor stacking.
Shelf life: 8 months.
We would love to speak with you.
Feel free to reach out using the below details.
2K epoxy sealer primer engineered for deep penetration and encapsulation of concrete and cement substrates. Seals and stabilizes surfaces to optimize adhesion for subsequent coating systems. Surface dry in 1 hour, full cure in 7 days.
2K epoxy glass flake coating with exceptional chemical resistance and abrasion resistance for severe corrosive environments. Engineered for offshore structures, chemical plants & wastewater facilities. Achieves up to 300µm DFT in heavy-duty applications.