New polymer anti-corrosion coating (2K) for water, oil, and sewage pipelines.
Municipal water, circulating water, sewage, oil pipelines.
Recoat 12 h–7 d; pot life 4 h.
Resists acids/alkalis/salts; seawater resistance.
Overview
Multi-layer anti-corrosion coating system (primer/intermediate/topcoat) for pipelines, tanks, and steel structures.
Composition
Olefin-modified epoxy resin and polyurethane resin binder, with pigments/fillers, additives, solvent.
Typical uses
Anti-corrosion for internal/external walls of municipal water supply and power plant circulating water pipelines.
Anti-corrosion for metallurgy and chemical industries, steel structures and storage tanks, oil pipelines, and sewage pipelines.
Technical data (typical)
Appearance: primer iron red or micaceous iron oxide red; intermediate grey; topcoat various colors.
Theoretical consumption: primer 0.15 kg/m² at 50 µm DFT (loss not included).
Theoretical consumption: intermediate 0.15 kg/m² at 50 µm DFT (loss not included).
Theoretical consumption: topcoat 0.16 kg/m² at 50 µm DFT (loss not included).
Density: primer 1.37 kg/L; intermediate 1.43 kg/L; topcoat 1.2 kg/L.
Drying time (25°C): surface dry 1 h; hard dry 24 h; full cure 7 d.
Application data (25°C)
Mixing ratio (A:B): primer 24:3; intermediate 27:3; topcoat 18:3.
Induction time: 5 min.
Pot life: 4 h.
Application methods: airless spray, brush, roller.
Thinner: dedicated thinner, 3–8%.
Recoat interval: min 12 h; max 7 d.
Recommended DFT per coat: 40–70 µm (brush/roller 30–40 µm).
System: GZ-2 primer + intermediate + topcoat.
Surface preparation
Steel: blast to Sa 2.5 or power-tool clean to St 3; surface profile 30–75 µm.
System compatibility / packing / storage
System compatibility: GZ-2 primer + intermediate + topcoat.
Packing: primer Part A 24 kg, Part B 3 kg; intermediate Part A 27 kg, Part B 3 kg; topcoat Part A 18 kg, Part B 3 kg.
Storage: dry, cool, ventilated; away from fire; avoid strong sunlight; no outdoor storage.
Shelf life: 12 months.
We would love to speak with you.
Feel free to reach out using the below details.
Indoor Non-Intumescent Fireproof Coating for Steel Structure – Indoor cementitious thermal-insulation fireproof coating for steel.
3 h rating: ≥33 mm; 20–22 kg/m²; 5–6 coats.
Air spray 0.6–0.8 MPa; nozzle Φ4.0–6.0 mm.
Fire test: 32 mm thickness; 5400 mm span; 3.00 h.
Vinyl Phosphating Primer (2K) – Two-component phosphating primer for galvanized steel, aluminum, and other light metals.
Forms chemical adhesion to improve intercoat adhesion of subsequent coatings.
Low film thickness system: 15–25 µm DFT per coat; theoretical consumption 0.06 kg/m² at 20 µm DFT.
Min. recoat 2 h (25°C); dedicated PLX06 thinner (10–20%).
Epoxy Sealer Primer (2K) – Two-component penetrating sealer primer for porous substrates.
For cement mortar, concrete, and fiber cement boards; also stated for wood.
Concrete moisture content < 6% before application (as stated).
Mix ratio 16:4; theoretical consumption 0.29 kg/m² at 50 µm DFT.
Epoxy Red Lead Anti-Rust Primer (2K) – Two-component epoxy anti-rust primer for steel corrosion protection.
Protect. Perform. Endure. – Advanced Coatings for Industrial Excellence.
© 2025 All Rights reserved Anhui HUILI Coating Technology Co., Ltd. | Privacy Policy